This Bid Bulletin dated June 28, 2019 is issued to clarify, modify or amend items in the Bidding Documents. This shall form an integral part of the Bid Documents.

Click the image below for details.

SBB08 S2019 Supply Delivery Installation and Commissioning of Various Mechanical Engineering Laboratory Equipment